Arcade-Cripple Creek Trail Project (formerly Electric Greenway Trail Project)

Project Schedule:

Construction is anticipated to occur from October 2022 to August 2023. 

In general, the Project will be constructed in phases, moving from west to east (starting at Sunrise Blvd and ending at Wachtel Way). 

Summary of Progress (anticipated dates Oct 2022 - Dec 2022)
LOCATION ITEM
Entire Trail Tree Removal / Clear & Grub
Sunrise Blvd between Arcadia and Sayonara Trail Construction
On SMUD Access Rd between Sunrise and Substation Trail Construction
  1. Project Description
  2. Project Funding
  3. Project Location
  4. Other Project Information
  5. Community Engagement

Project Description:

The City is constructing a 2.9 mile long multi-use trail between Sunrise Boulevard (near Arcade Creek Park Preserve) and Wachtel Way that will largely follow an existing Sacramento Municipal Utility District (SMUD) electric corridor easement. The project is located in the City and unincorporated Orangevale, and connects several neighborhoods to eight parks, several schools and the Sunrise MarketPlace. In addition to a paved multi-use trail, this Project also includes:

• A new signalized crossing of Fair Oaks Boulevard
• Pathway lighting
• Sidewalk, curb and gutter along a segment of Oak Avenue
• Drainage improvements
• Traffic signal modifications
• Landscaping

Contact:

For questions about the project, please contact the General Services Department at 916-727-4770.