Electric Greenway Trail Project

Virtual Community Workshop

Please take a few minutes to share your input on the Electric Greenway Trail Project.  Click the link to go to the Virtual Community Workshop http://www.electricgreenway.net. We want to hear from you! Responses will be collected through June 4, 2019.

Community Open House on May 21, 2019

Join us for the second community open house for the Electric Greenway Trail Project on Tuesday, May 21st from 5:00 PM - 7:00 PM at the Sunrise Tech Center, located at 7322 Sunrise Blvd in Citrus Heights. Drop by anytime to view and discuss project updates, learn about the plans, and provide input on various elements of the project. RSVPs are requested, but not required at www.electricgreenwayOH2.eventbrite.com.

Click below to see the informational flyer about this open house:

In English

In Spanish

In Russian

Project Description:

The Electric Greenway Trail Project is a 2.9 mile multi-use trail between Sunrise Boulevard (near Arcade Creek Park Preserve) and Wachtel Way largely following an existing Sacramento Municipal Utility District (SMUD) electric corridor easement. The project is located in the city and unincorporated Orangevale, and connects several neighborhoods to seven parks, several schools and the Sunrise MarketPlace.  In addition to a paved multi-use trail, this Project also includes:

•    A new signalized crossing of Fair Oaks Boulevard
•    Pathway lighting
•    Sidewalk, curb and gutter along a segment of Oak Avenue
•    Drainage improvements
•    Traffic signal modifications, and
•    Landscaping


Project Location:

Environmental Review

The Electric Greenway has undergone environmental analysis as required by the California Environmental Quality Act (CEQA). This analysis evaluates the potential for environmental impacts in numerous categories. On May 1, the city released a Notice of Intent to adopt a Mitigated Negative Declaration (MND) for the Electric Greenway Project.

The Mitigated Negative Declaration will be considered by the City Council at a public hearing on June 27, 2019 at 7 PM at the City Council Chambers.  A staff report with additional information will be available the week of June 17, 2019.

Written comments on the MND may be submitted between May 1, 2019 and May 31, 2019.  Please submit any comments to Casey Kempenaar at ckempenaar@citrusheights.net.  

View the documents by clicking below.

Notice of Intent and Notice of Public Hearing

CEQA Initial Study/Proposed Mitigated Negative Declaration

Project Status: 

The project is in the preliminary analysis and environmental review phase.   A design consultant firm, GHD, has been leading the design, environmental clearance, and right-of-way phases of the project. 

Project Partners: 

This project will install facilities within seven parks owned and maintained by Sunrise Recreation & Park District  and Orangevale Recreation & Park District.
Contact:   General Services Department, (916) 727-4770 or ElectricGreenway@citrusheights.net

Thank you to those who attended the Community Open House Tuesday, January 8, 2019! 

On Tuesday, January 8, 2019, the City of Citrus Heights hosted an informational Open House for the Electric Greenway Trail Project at the Sunrise Tech Center Multi-Purpose Room, located at 7322 Sunrise Blvd.  For more information about the project, please see the video above.

Use the links below to see the presentation materials from the Open House. The FAQ's are posted at the top of this page.

Electric Greenway Fact Sheet: English    Spanish   Russian

Trail Alignment Exhibits:   Page 1   Page 2   Page 3   Page 4   Page 5   Page 6   

Page 7   Page 8   Page 9   Page 10

Photo Exhibits: Pages 1 - 2     Pages 3 - 4

Park Overview Exhibits: Tempo Park  Sundance Natural Area  Streng Ave Open Space

Northwoods Park   C-Bar-C Park-A   C-Bar-C Park-B   Woodside Oaks Open Space



Page last updated May 8, 2019.