Electric Greenway Trail Project

Project Description:

The Electric Greenway Trail Project is a 2.9 mile multi-use trail between Sunrise Boulevard (near Arcade Creek Park Preserve) and Wachtel Way largely following an existing Sacramento Municipal Utility District (SMUD) electric corridor easement. The project is located in the city and unincorporated Orangevale, and connects several neighborhoods to seven parks, several schools and the Sunrise MarketPlace.  In addition to a paved multi-use trail, this Project also includes:

•    A new signalized crossing of Fair Oaks Boulevard
•    Pathway lighting
•    Sidewalk, curb and gutter along a segment of Oak Avenue
•    Drainage improvements
•    Traffic signal modifications, and
•    Landscaping


Project Location:

Project Status: 

The project is in the preliminary analysis and environmental review phase.   A design consultant firm, GHD, has been selected to lead the design, environmental clearance, and right-of-way phases of the project. 

Project Partners: 

This project will install facilities within seven parks owned and maintained by Sunrise Recreation & Park District  and Orangevale Recreation & Park District.
Contact:   General Services Department, (916) 727-4770 or ElectricGreenway@citrusheights.net

Thank you to those who attended the Community Open House Tuesday, January 8, 2019! 

On Tuesday, January 8, 2019, the City of Citrus Heights hosted an informational Open House for the Electric Greenway Trail Project at the Sunrise Tech Center Multi-Purpose Room, located at 7322 Sunrise Blvd.  For more information about the project, please see the video above.

Use the links below to see the Fact Sheets about the project. Check back for additional presentation materials from the Open House. FAQ's are posted above. 

Electric Greenway Fact Sheet: English, Spanish, Russian.