Greenback Lane Complete Streets

Project Description:

The Greenback Lane Complete Streets Improvements Project will rehabilitate this major arterial corridor between Sunrise Boulevard and Fair Oaks Boulevard. The goal is to enhance pedestrian and bicycle mobility, improve traffic flow and improve the rideability and aesthetics of the corridor.

The project will encompass the following improvements:

  • Roadway resurfacing for smooth driving
  • Repairs/upgrades to existing storm drainage infrastructure 
  • Upgrading select traffic signal equipment at Fair Oaks Blvd., Arcadia Dr. and Sunrise Blvd. 
  • At the Fair Oaks Blvd. and Greenback Ln. intersection: 
    1. Reconstructing/realigning sidewalks and ADA compliant curb ramps on all four corners to eliminate painted pedestrian islands, shorten the pedestrian crossing distances (north - south and east – west) and improve overall safety and mobility at the corners
    2. Installing new pedestrian push buttons and posts at all crossing points
    3. Relocating the Pedestrian signal heads to align with new crossings
  • Installing updated ADA compliant curb ramps at remaining intersections within project as needed
  • Installing new traffic signal communication equipment

Project Status:

The design of the project is complete. The City received contractor bids and will make a recommendation to the City Council to award a construction contract. We anticipate construction to begin in Spring of 2022. 

Page last updated January 4, 2022.